97超碰在线播放-亚洲一区中文字幕-麻豆短视频-欧美日韩午夜-午夜一级片-国产欲妇-欧美性天天-91国语对白-亚洲黄色大全-自拍偷拍第五页-欧美日韩高清一区二区三区-av色噜噜-精品裸体舞一区二区三区-久久人爽-在线视频观看一区-每日更新在线观看av-亚洲第一免费-a成人在线-69av国产-中文在线а√天堂-一个人看的www视频在线观看-www欧美在线-怡红院精品视频-欧美一级三级在线观看-免费电影一区二区三区

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site